Kamis, 06 Januari 2011

CCNA Discovery 4 Module 2 Exam Answers Version 4.0

CCNA Discovery 4 Module 2 Exam Answers Version 4.0

1. During an evaluation of the currently installed network, the IT staff performs a gap analysis to determine whether the existing network infrastructure can support the desired new features. At which stage of the Cisco Lifecycle Services approach does this activity occur?
• Prepare Phase
• Plan Phase
• Design Phase
• Implement Phase
• Operate Phase
• Optimize Phase

2. Which stage of the Cisco Lifecycle Services strategy is usually completed before an organization issues a Request For Proposal (RFP) or Request For Quotation (RFQ)?
• Prepare Phase
• Plan Phase
• Design Phase
• Implement Phase
• Operate Phase
• Optimize Phase

3. What is the purpose of SNMP?
• to facilitate the exchange of information between devices and the NMS
• to monitor and control managed network devices
• to report user logins to a monitoring station
• to verify traffic throughout the network and keep a log of all activity

4. During an analysis of a customer network, several possible opportunities for network improvement are identified. At which stage of the Cisco Lifecycle Services does this process occur?
• Prepare Phase
• Plan Phase
• Design Phase
• Implement Phase
• Optimize Phase
• Operate Phase

5. What provides the initial data for the Optimize Phase?
• performance monitoring
• business goals
• technical goals
• RFP

6. Which two statements are true regarding the response to an RFQ?(Choose two.)
• The response should be brief.
• it should strictly conform to the formatting requirements specified by the RFQ.
• Only the items that the contracting company will be addressing should be answered.
• The response helps the customer compare pricing with other potential contractors.
• The response is more complicated than a response to a RFP.

7. What are two disadvantages of using a bottom-up approach instead of a top-down approach to network design? (Choose two.)
• It can result in an inappropriate network design.
• A new design cannot be implemented right away.
• It does not take into account the business goals of the company.
• This approach is not commonly practiced and is therefore not as well known.
• It requires tedious and time-consuming meetings with the customer to develop an understanding of the organization.

8. What is a business constraint that may impact the WAN design of a company?
• company policy regarding specific operating systems on LAN devices
• current monitoring protocols implemented on end-user devices
• non-availability of end users during implementation
• company policy requiring the use of specific vendor networking equipment due to partnerships

9. What is the purpose of preparing a business case?
• to justify the financial investment in implementing the technology change
• to provide an example of a previous job done in the RFP
• to define the technical requirements of the network
• to define timelines and critical milestones

10. What is the purpose of creating a prioritized list of technical requirements?
• defines the project scope
• determines the business profitability
• creates a feasibility report for analysis
• identifies existing and new user groups

11. A network engineer is analyzing the network of a potential client company to identify problems and determine whether a network upgrade or addition is needed. Which role in the sales team is this engineer assuming?
• post-sales field engineer
• pre-sales engineer
• account manager
• network designer

12. Which two statements best describe the responsibilities of an account manager? (Choose two.)
• acts as the primary point of contact between the company and the client
• directs the sales teams and support personnel
• provides technical support to critical clients
• selects the equipment and technologies to be used for the client solution
• acts as the network design lead

13. What is the purpose of system-level acceptance testing?
• To develop an installation plan for the newly designed network
• to train end users and support personnel on the newly installed network
• to check that the newly installed network meets the business goals and design requirements
• to justify the financial investment required to implement the technology change

14. What is a purpose of establishing a network baseline?
• It provides a statistical average for network performance.
• It manages the performance of network devices.
• It creates a point of reference for future network evaluations.
• It checks the security configuration of network devices.

15. When should a network baseline be performed within the stages of the Cisco Lifecycle Services?
• Prepare Phase
• Plan Phase
• Design Phase
• Implement Phase
• Operate Phase

16. What are two benefits of using a top-down approach instead of a bottom-up approach to network design? (Choose two.)
• incorporates organizational requirements
• allows for a quick response to a design request
• requires less time up front to create a network design
• clarifies design goals from the perspective of applications and network solutions
• facilitates a design by using devices and technologies that are based on previous experience

17. Which software component is installed on network devices that are managed through SNMP?
• management agents
• management stations
• network management protocol
• Management Information Base (MIB)

18. A network engineer working for a contracting company is informed of a pre-bid meeting with a potential client. What purpose does the network engineer have for attending the pre-bid meeting?
• to submit request for proposal responses
• to discuss proposed installation and monitoring plans
• to perform system-level acceptance tests on the current network
• to clarify project scope and timelines not included in the original request for proposal
• to create a business case outlining reasons for financial investment in a network upgrade

19. A major corporation has decided to hire someone to upgrade their network infrastructure. A network consulting company wants the job. What document must the network consulting company obtain to learn about the business goals, the project scope, the requirements for the new network and the expected deliverables?
• Business Case
• Project Plan
• Request for Proposal
• Request for Comments

20. A corporation (client) wants a network upgrade and is putting out a request for services to various network consulting companies (contractors). A RFQ is required. Which statement is true concerning the RFQ?
• sent from the contractors to the client in response to a RFP
• sent from the client to the contractors along with the RFP to provide more specific technical details
• sent from the client to the contractors in place of a RFP when the technical specifications of a project are known
• sent from the contractors to the client outlining reasons for financial investments for the network upgrade

21. Which stage of the Cisco Lifecycle Services involves proactive management to identify and resolve issues before the organization is affected?
• Prepare Phase
• Plan Phase
• Design Phase
• Implement Phase
• Operate Phase
• Optimize Phase

22. Why is it important to prioritize business goals when developing network design?
• to ensure that the least expensive technologies are implemented first
• to simplify the configuration, administration, and monitoring of the newly installed network
• to anticipate the effects of changes and growth of the business
• to adhere to the best opportunities to contribute to the success of the business

23. Which two items help identify business goals and priorities before a new network project starts? (Choose two.)
• installation
• motivation
• profitability
• trustworthiness
• customer satisfaction

24. A network engineer working for ABC company is writing a response to an RFP for a network upgrade and must create an executive summary. Which statement describes the basic components of an executive summary?
• quick overview of the problem, the recommended solution, and the justification for ABC company doing the job
• detailed description of the solution, including but not limited to, timelines, turnover schedule, warranty information, and emergency recovery information
• detailed description of costs including, the cost of software and hardware components, licensing requirements, labor cost, and other applicable fees
• multiple page document containing additional information such as detailed lists of equipment required, diagrams, company background information, and insurance coverage

25. In a network management architecture, which statement best describes a management agent?
• communication protocol used between a management station and managed device
• standardized database that a device keeps about itself concerning network performance parameters
• host with the management application loaded that is used by the administrator to monitor and configure network devices
• software running on a managed device to collect network information and allow that device to be managed by a management station

Tugas CCNA 3 Lab 8.3.4 Planning, Configuring and Verifying Extended ACLs

Lab 8.3.4 Planning, Configuring and Verifying Extended ACLs

Step 1: Connect the equipment

1. Connect the Serial 0/0/0 interface of Router 1 to the Serial 0/0/0 interface of Router 2 using a serial cable.
2. Connect the Fa0/0 interface of Router 1 to the Fa0/1 port of Switch 1 using a straight-through cable.
3. Connect a console cable to each PC to perform configurations on the routers and switch.
4. Connect Host 1 to the Fa0/3 port of Switch 1 using a straight-through cable.
5. Connect Host 2 to the Fa0/2 port of Switch 1 using a straight-through cable.
6. Connect a crossover cable between Host 3 and the Fa0/0 interface of Router 2.

Step 2: Perform basic configuration on Router 1

1. Connect a PC to the console port of the router to perform configurations using a terminal emulation program.
2. On Router 1, configure the hostname, interfaces, passwords, and message-of-the-day banner and disable DNS lookups according to the addressing table and topology diagram. Save the configuration.

Step 3: Perform basic configuration on Router 2
Perform basic configuration on Router 2 and save the configuration.
Step 4: Perform basic configuration on Switch 1
Configure Switch 1 with a hostname, console, Telnet, and privileged passwords according to the addressing table and topology diagram.
Step 5: Configure the hosts with IP address, subnet mask, and default gateway

1. Configure the hosts with IP address, subnet mask, and default gateway according to the addressing table and the topology diagram.
2. Each workstation should be able to ping the attached router. If the pings are not successful, troubleshoot as necessary. Check and verify that the workstation has been assigned a specific IP address and default gateway.

Step 6: Configure RIP routing and verify end to end connectivity in the network

1. On R1, enable the RIP routing protocol and configure it to advertise both connected networks.
2. On R2, enable the RIP routing protocol and configure it to advertise both connected networks.
3. Ping from each host to the other two hosts.

Were the pings successful? __________ yes
If the answer is no, troubleshoot the router and host configurations to find the error. Ping again until they are all successful.
Step 7: Configure Extended ACLs to control traffic
Host 3 in this network contains proprietary information. Security requirements for this network dictate that only certain devices should be allowed access to this machine. Host 1 is the only host that will be allowed to access this computer. All other hosts on this network are used for guest access and should not be allowed access to Host 3.
Step 8: Test the ACL

1. Ping Host 3 from both Hosts 1 and 2.

Can Host 1 ping Host 3? __________ yes
Can Host 2 ping Host 3? __________ no

1. To verify that other addresses can ping Host 3, ping Host 3 from R1.

Is the ping successful? __________ yes

1. Display the access control list again with the show access-lists command.

Step 9: Configure and test the ACL for the next requirement

1. Host 3 is the only host that should be allowed to connect to R1 for remote management.
2. Because the source traffic could come from any direction, this ACL needs to be applied to both interfaces on R1. The traffic to be controlled would be inbound to the router.
3. Now attempt to telnet to R1 from all hosts and R2. Attempt to telnet to both R1 addresses.

Can you telnet to R1 from any of these devices? If yes, which one(s)? Jawaban: Yes, from Host 3 only.

1. View the output of the show access-lists command on R1.

Step 11: Reflection

1. Why is careful planning and testing of access control lists required? Jawaban: To verify that the intended traffic – and ONLY the intended – traffic is permitted.
2. What is an advantage of using Extended ACLs over Standard ACLs? Jawaban: Extended ACLs allow you to filter based on more information that just the source address.

Tugas CCNA 3 Lab 8.3.3 Configuring and Verifying Standard ACLs

Lab 8.3.3 Configuring and Verifying Standard ACLs
Step 1: Connect the equipment
  1. Connect the Serial 0/0/0 interface of Router 1 to the Serial 0/0/0 interface of Router 2 using a serial cable.
  2. Connect the Fa0/0 interface of Rourter 1 to the Fa0/1 port of Switch 1 using a straight-through cable.
  3. Connect a console cable to the PC to perform configurations on the routers and switch.
  4. Connect H1 to the Fa0/2 port of Switch 1 using a straight-through cable.
Step 2: Perform basic configuration on Router 1
  1. Connect a PC to the console port of the router to perform configurations using a terminal emulation program.
  2. On Router 1, configure the hostname, interfaces, passwords, and message-of-the-day banner and disable DNS lookups according to the addressing table and topology diagram. Save the configuration.
Step 3: Perform basic configuration on Router 2
Perform basic configuration on Router 2 and save the configuration.
Step 4: Perform basic configuration on Switch 1
Configure Switch 1 with a hostname and passwords according to the addressing table and topology diagram.
Step 5: Configure the host with IP address, subnet mask, and default gateway
  1. Configure the host with the proper IP address, subnet mask, and default gateway. The host should be assigned the address 192.168.200.10/24 and the default gateway of 192.168.200.1.
  2. The workstation should be able to ping the attached router. If the ping is not successful, troubleshoot as necessary. Check and verify that the workstation has been assigned a specific IP address and default gateway.
Step 6: Configure RIP routing and verify end-to-end connectivity in the network
  1. On Router 1, enable the RIP routing protocol and configure it to advertise both connected networks.
  2. On Router 2, enable the RIP routing protocol and configure it to advertise all three connected networks.
  3. Ping from Host 1 to the two loopback interfaces on Router 2.
Were the pings from Host 1 successful? __________ yes
If the answer is no, troubleshoot the router and host configurations to find the error. Ping again until they are both successful.
Step 7: Configure and test a standard ACL
Step 8: Test the ACL
  1. From Host 1, ping the 192.168.1.1 loopback address.
Is the ping successful? __________ No
  1. From Host 1, ping the 192.168.2.1 loopback address.
Is the ping successful? __________ No
  1. Issue the show access-list command again.
How many matches are there for the first ACL statement (permit)? __________
Answers will vary but there should be at least 8-16 matches if the pings to the loopbacks were done.
Step 9: Reflection
  1. Why is careful planning and testing of access control lists required? Jawaban: To verify that the intended traffic – and ONLY the intended – traffic is permitted.
  2. What is the main limitation of standard ACLs? Jawaban: They can only filter based on source address.

Template by:

Free Blog Templates